July 6 – 10
Monday: Beautiful floor is covered again with RamBoard (cardboard to protect the floor from dings and scratches). Cabinet install comes to a halt after water stop cocks in hall bath leak after re-installation. The plumber will replace them when he comes to install the sink but they’re plugged for now.
Tile guy arrivesĀ at lunchtime and finishes area around window and bullnose on pony wall edges. Grouting tomorrow.