Category Archives: Weekly summary

Week 24: Under stair cabinets, paint touch ups, bookshelves

August 24-28

Week 24 quick look

Monday: Bonus room bookcase inserts. Under stair cabinets. Upstairs network outlets connected while we were away but the network doesn’t function (cable modem was connected to switch instead of Airport Extreme) Continue reading Week 24: Under stair cabinets, paint touch ups, bookshelves

Week 22: hardwood final coat, ramp sink, backsplash, glass template

August 10-14

Week 22 quick look

Monday: Backsplash for kitchen and downstairs half bath  & ramp sink for master bathroom.  A little nudge from the guy who runs Westhill apparently got the ramp sink to the head of the line. The slot drain is 1/8″ wider on one end, so they’ll have someone out tomorrow to do the Caesarstone equivalent of planing it to an even thickness. Continue reading Week 22: hardwood final coat, ramp sink, backsplash, glass template

Week 21: Carpet, network, painting, electrical

August 3-7

Week 21 Quick Look

Monday: Painters worked on bonus room, master bathroom, hall closet, pantry, back stair well and various touch ups. They also had to respray (after “floating” some filler to cover the chips) the family room cabinet doors. Continue reading Week 21: Carpet, network, painting, electrical

Week 19: Stair railings (really), countertop, network wiring

July 20 – 24

Week 19 quick look

Monday: Cabinet installation – master bathroom and bonus room desk+shelves. The stair guy worked the entire day in his workshop (what used to be our garage) cutting and working on items for the stair railings and base. Continue reading Week 19: Stair railings (really), countertop, network wiring

Week 18: Bathroom cabinets, stair railings, templating

July 13-17

Week 18 quick look

Evaluating the new reading spot
Folding camp chair to check out the new skylights

I set up a folding camp chair in the corner of the bonus room to see what it was like as a reading spot – light behind you for reading and fresh air and a view in front of you. I think I like it 🙂

The venting skylight gets the late afternoon sun. The existing skylights on the other side get morning light. Did I mention I like windows?

Continue reading Week 18: Bathroom cabinets, stair railings, templating

Week 17: Cabinets, grout, cork flooring, closets

July 6 – 10

Week 17 quick look

Tile edge
Tile landing zone outside master shower

Monday: Beautiful floor is covered again with RamBoard (cardboard to protect the floor from dings and scratches). Cabinet install comes to a halt after water stop cocks in hall bath leak after re-installation. The plumber will replace them when he comes to install the sink but they’re plugged for now.

Tile guy arrives at lunchtime and finishes area around window and bullnose on pony wall edges. Grouting tomorrow.

Continue reading Week 17: Cabinets, grout, cork flooring, closets

Week 16: Cabinets, hardwood floor, bathroom tile

June 29 – July 3

Week 16 quick look

Monday: Morning zoo, afternoon silence! The painters (not a full crew) were finishing up initial wall painting in the bonus room and walls in the hall by the family room. The kitchen cabinets were delivered, unloaded and piled up in the family room. The hardwood floor crew (2) arrived as did the tile guy for the master bathroom! Continue reading Week 16: Cabinets, hardwood floor, bathroom tile