Tag Archives: electrical

Are we there yet?: Under stair cabinets, touch-ups, glass….

August 31 – whenever we get our house back

Is it obvious I’m really ready for this phase of the work to be done?

Putting the house back together is the next phase, but first there’s all sorts of touch up and finishing steps. We are all done with the all day/every day part at this point. Continue reading Are we there yet?: Under stair cabinets, touch-ups, glass….

Week 24: Under stair cabinets, paint touch ups, bookshelves

August 24-28

Week 24 quick look

Monday: Bonus room bookcase inserts. Under stair cabinets. Upstairs network outlets connected while we were away but the network doesn’t function (cable modem was connected to switch instead of Airport Extreme) Continue reading Week 24: Under stair cabinets, paint touch ups, bookshelves

Week 21: Carpet, network, painting, electrical

August 3-7

Week 21 Quick Look

Monday: Painters worked on bonus room, master bathroom, hall closet, pantry, back stair well and various touch ups. They also had to respray (after “floating” some filler to cover the chips) the family room cabinet doors. Continue reading Week 21: Carpet, network, painting, electrical

Week 19: Stair railings (really), countertop, network wiring

July 20 – 24

Week 19 quick look

Monday: Cabinet installation – master bathroom and bonus room desk+shelves. The stair guy worked the entire day in his workshop (what used to be our garage) cutting and working on items for the stair railings and base. Continue reading Week 19: Stair railings (really), countertop, network wiring

Week 11: framing, HVAC, electrical, cabinet measurements

May 25 – 29

Week 11 quick look

More furniture moving
Moving the furniture away from the center of the room

Monday:  Memorial Day holiday, so no workers today, but we have to rearrange the bedroom to clear a floor joist that the cooktop vent ducting will go in. Continue reading Week 11: framing, HVAC, electrical, cabinet measurements