August 17-21
We were away this week, so I don’t know what day things were done, but over the course of this week: Continue reading Week 23: While we were away
August 17-21
We were away this week, so I don’t know what day things were done, but over the course of this week: Continue reading Week 23: While we were away
August 3-7
Monday: Painters worked on bonus room, master bathroom, hall closet, pantry, back stair well and various touch ups. They also had to respray (after “floating” some filler to cover the chips) the family room cabinet doors. Continue reading Week 21: Carpet, network, painting, electrical
July 27 – 31
Monday: Sorting out the leak from the hall bath into the downstairs light fixture. See the separate blog post on the good and bad of the leaking wet room. Continue reading Week 20: Cabinets, plumbing and electrical trim, painting
July 20 – 24
Monday: Cabinet installation – master bathroom and bonus room desk+shelves. The stair guy worked the entire day in his workshop (what used to be our garage) cutting and working on items for the stair railings and base. Continue reading Week 19: Stair railings (really), countertop, network wiring
May 25 – 29
Monday: Memorial Day holiday, so no workers today, but we have to rearrange the bedroom to clear a floor joist that the cooktop vent ducting will go in. Continue reading Week 11: framing, HVAC, electrical, cabinet measurements