Week 19: Stair railings (really), countertop, network wiring

July 20 – 24

Week 19 quick look

Monday: Cabinet installation – master bathroom and bonus room desk+shelves. The stair guy worked the entire day in his workshop (what used to be our garage) cutting and working on items for the stair railings and base. Continue reading Week 19: Stair railings (really), countertop, network wiring

Week 18: Bathroom cabinets, stair railings, templating

July 13-17

Week 18 quick look

Evaluating the new reading spot
Folding camp chair to check out the new skylights

I set up a folding camp chair in the corner of the bonus room to see what it was like as a reading spot – light behind you for reading and fresh air and a view in front of you. I think I like it 🙂

The venting skylight gets the late afternoon sun. The existing skylights on the other side get morning light. Did I mention I like windows?

Continue reading Week 18: Bathroom cabinets, stair railings, templating

Week 17: Cabinets, grout, cork flooring, closets

July 6 – 10

Week 17 quick look

Tile edge
Tile landing zone outside master shower

Monday: Beautiful floor is covered again with RamBoard (cardboard to protect the floor from dings and scratches). Cabinet install comes to a halt after water stop cocks in hall bath leak after re-installation. The plumber will replace them when he comes to install the sink but they’re plugged for now.

Tile guy arrives at lunchtime and finishes area around window and bullnose on pony wall edges. Grouting tomorrow.

Continue reading Week 17: Cabinets, grout, cork flooring, closets

Week 16: Cabinets, hardwood floor, bathroom tile

June 29 – July 3

Week 16 quick look

Monday: Morning zoo, afternoon silence! The painters (not a full crew) were finishing up initial wall painting in the bonus room and walls in the hall by the family room. The kitchen cabinets were delivered, unloaded and piled up in the family room. The hardwood floor crew (2) arrived as did the tile guy for the master bathroom! Continue reading Week 16: Cabinets, hardwood floor, bathroom tile

Evolution of the house since February 2000 – rear

We moved into the house at the end of February 2000 and it has gone through many changes (I think improvements!) in the 15 years since. As I was looking at the new windows go in for the 2015 remodel, I started collecting the various  “ages and stages” pictures for the back of the house and garden. Continue reading Evolution of the house since February 2000 – rear

Week 14: sanding, texture, primer, caulk, paint

June 15 – 19

Week 14 quick look

Monday: The featured image is the skylights-to-be, in the hope that the roofer will be here on Friday to install the Velux skylights. The large one will be an opening solar skylight (like the others we installed last year to replace the fixed ones original to the house). The two narrow ones are fixed (cables in the rafters would be expensive to move, so this was a cost-effective compromise). Continue reading Week 14: sanding, texture, primer, caulk, paint