When your shower door “explodes”!

The aftermath

In 2015 we remodeled a number of rooms in our home and have been enjoying the results in the four years since. I had no idea that tempered glass – used in both bathrooms – had a party trick reminiscent of spontaneous combustion, but I’m now wiser. And thankfully unhurt by the experience. You can compare the original bathroom look here, and the other bathroom’s glass looks like this. Safety glass was a term I thought I understood – in an “I know what that’s for” sort of way, versus really having a clue how it was made, what its risks vs. benefits were or anything else specific. Silly human! If you want to read a very brief overview, see what the Glass Doctor has to say.

Continue reading When your shower door “explodes”!

The remodeling project is (virtually) complete!

March 16 – October 16th (ish)

I’m declaring the project complete even though we have one small outstanding work item (a replaced cork tile needs sealing) and one missing warranty (for the heated floor). I still have some areas to tidy up in the post-remodel shuffle – such as replacing the doors on the upstairs hall closet, taken off to make more room when moving things through the tight 90 degree turn in that corridor – but that’ll get done soon-ish. Continue reading The remodeling project is (virtually) complete!

Week 18: Bathroom cabinets, stair railings, templating

July 13-17

Week 18 quick look

Evaluating the new reading spot
Folding camp chair to check out the new skylights

I set up a folding camp chair in the corner of the bonus room to see what it was like as a reading spot – light behind you for reading and fresh air and a view in front of you. I think I like it šŸ™‚

The venting skylight gets the late afternoon sun. The existing skylights on the other side get morning light. Did I mention I like windows?

Continue reading Week 18: Bathroom cabinets, stair railings, templating

Week 17: Cabinets, grout, cork flooring, closets

July 6 – 10

Week 17 quick look

Tile edge
Tile landing zone outside master shower

Monday: Beautiful floor is covered again with RamBoard (cardboard to protect the floor from dings and scratches). Cabinet install comes to a halt after water stop cocks in hall bath leak after re-installation. The plumber will replace them when he comes to install the sink but they’re plugged for now.

Tile guy arrivesĀ at lunchtime and finishes area around window and bullnose on pony wall edges. Grouting tomorrow.

Continue reading Week 17: Cabinets, grout, cork flooring, closets

Week 16: Cabinets, hardwood floor, bathroom tile

June 29 – July 3

Week 16 quick look

Monday: Morning zoo, afternoon silence! The painters (not a full crew) were finishing up initial wall painting in the bonus room and walls in the hall by the family room. The kitchen cabinets were delivered, unloaded and piled up in the family room. The hardwood floor crew (2) arrived as did the tile guy for the master bathroom! Continue reading Week 16: Cabinets, hardwood floor, bathroom tile

Week 14: sanding, texture, primer, caulk, paint

June 15 – 19

Week 14 quick look

Monday: The featured image is the skylights-to-be, in the hope that the roofer will beĀ here on Friday to install the Velux skylights. The large one will be an opening solar skylight (like the others we installed last year to replace the fixed ones original to the house). The two narrow ones are fixed (cables in the rafters would be expensive to move, so this was a cost-effective compromise). Continue reading Week 14: sanding, texture, primer, caulk, paint

Week 11: framing, HVAC, electrical, cabinet measurements

May 25 – 29

Week 11 quick look

More furniture moving
Moving the furniture away from the center of the room

Monday:Ā  Memorial Day holiday, so no workers today, but we have to rearrange the bedroom to clear a floor joist that the cooktop vent ducting will go in. Continue reading Week 11: framing, HVAC, electrical, cabinet measurements