August 17-21
We were away this week, so I don’t know what day things were done, but over the course of this week: Continue reading Week 23: While we were away
August 17-21
We were away this week, so I don’t know what day things were done, but over the course of this week: Continue reading Week 23: While we were away
July 27 – 31
Monday: Sorting out the leak from the hall bath into the downstairs light fixture. See the separate blog post on the good and bad of the leaking wet room. Continue reading Week 20: Cabinets, plumbing and electrical trim, painting
May 18 – 22
Monday: A noisy week begins – multiple rooms, multiple crews of people and very little quiet. Framing in master bathroom and electrical rough-in continues. Continue reading Week 10: framing, plumbing & electrical rough-in
April 20 – 24
Monday: Bathtub, faucets for vanity sinks and toilet installed. No water for the morning. Continue reading Week 6 – plumbing, garage drywall, glass?
March 23 – 27
Monday: drywall in the non-wet room parts of the bathroom. As we couldn’t have a medicine cabinet once we flipped the room back to its original orientation, I asked for a second niche, using lumber left over from the previous remodel (I’m a pack rat, but this time it did come in handy!) Continue reading Week 2 – drywall, drains & ducts
March 16 – 20
Monday: Very noisy day. Demolish the hall bathroom – nothing but studs and insulation left at the end of the day. Lots of drywall, two sinks and a cast iron tub headed out. Continue reading Week 1 – demolish the hall bathroom